Drilled up remaining holes per flag note. Disassembled and deburred parts. Prepared faying surfaces for structural adheasive bonding. Mixed up a batch of Hysol. Applied Hysol to faying surface and assembled parts. Installing pull rivets and cleaning up excess Hysol.