KitLog pro

Powered By Kitlog Pro v2.0

N514KP
' style=
Date:  11-29-2004
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Finish lower shroud & install oil lines

Remake lower shroud. Install shroud, oil cooler and oil cooler lines.
' style=

Oil cooler with fittings

Oil cooler with fittings

' style=

Assembled oil line

Assembled oil line

' style=

Oil lines installed

Oil lines installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.