KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  6-19-2018
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Cowling nose job: add micro

Popped out to the hangar this evening. Sanded the reattached spinner ring areas on the upper and lower cowl to get rid of stray bits of epoxy, then buttered up the faces with gooey micro. This filled in the gap between the reattached rings and the rest of the cowling. Will have to snap some pics next time I'm out there.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.