Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
Finish
3-2-2013
< Previous Log Entry
Next Log Entry >
Date:
3-2-2013
Number of Hours:
3.00
Manual Reference:
n/a
Brief Description:
Install cbn heat cntl box; laminated Cu bus bar
Installed the heater box. I used nutplates on the cabin side of the f/w. Biotherm sealant applied to the faying surfaces around the hole.
Fabricated a Cu buss bar for the master/starter contactor connection. Used 5 layers of 0.025" Cu sheet, sweat soldered together.
Populating the firewall...
Master contactor/starter relay
Looking into cabin heat control box
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.