Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
Fuselage
9-29-2012
< Previous Log Entry
Next Log Entry >
Date:
9-29-2012
Number of Hours:
2.00
Manual Reference:
8
Brief Description:
Lay in the rudder cables
Installed grommets for the rudder cables and threaded the cables thru. Installed the plastic tube guides in the aft cable exits but did not fully tighten the Adel clamps.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.