KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  8-1-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Brake lines installed; started new fuel lines

Finished the flare on the right brake line. Snugged up the brake line fittings by hand, then tightened 1/4 turn. Previously, the bulkhead fittings at both ends of the line were installed with a dab of Permatex medium strength blue threadlock gel on the threads.

Cut new fuel lines and made bends so the lines from the tanks can pass each other to their respective valve ports, some what like image 1. Going to get a "spring bender" to guide the lines through the L.G. weldments, etc. A guy on VAF says it makes the job easy. At least there will be fewer dings on the lines to smooth out.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.