Brief Description: Match drilled last bracket to top fwd fuse; NACA
Made the jig to line up F-7108A with F7105A and match drilled the F7108C bracket. De-clecoed all of the top fuse skin and structure parts for deburring.
Took clecoes out of the NACA vents...the silicone seems to be holding them well. Still need to do the "JB-Weld" rivets on the vents.