KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  3-4-2012
Number of Hours:  3.30
Manual Reference:  8
Brief Description:  Reassembly of fwd fuselage continues...

Installed, torqued, and sealed the bolts tieing the bottom fwd longerons to the firewall weldment. Riveted the two center fwd bottom floor stiffenrs to the center section cover brackets and too the firewall brackets.

The right side F-902 to bottom longeron joint needed a spacer. Fabricated one, primed, and riveted right side F-902/spacer (and left F-902, sans spacer). Spot primed the various dings the fwd fuselage members had acquired in the course of reassembly.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.