KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  5-10-2011
Number of Hours:  2.80
Manual Reference:  8
Brief Description:  Longeron preparation

Bent the left main longeron. Begain drilling aft canopy deck to right main longeron.

The bend on the right longeron is still a bit bowed upwards. So I started at the forward end and used clamps & cauls (pieces of Al angle and plate) to bring the edge of the deck, the spacer piece of 032 Al, and the angle of the longeron into alignment, then match drill through the a.c.d.

By the time I get to the aft end of the a.c.d, alignment of the curved bend and the upward bow should be very close to perfect.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.