KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  4-5-2011
Number of Hours:  2.40
Manual Reference:  8
Brief Description:  F-712 & -711 bulkheads

Drilled the thru holes in the F-712E tie-down bar. Aligned and drilled to the -712A & -712B bulkhead pieces, which were clecoed together.

Clecoed F-710 A & B bulkhead pieces together and cut out the shaded area indicated by the plans with the band saw. Shaped one F-711C bar per the plans for a tri-gear RV-9A. Just started to transfer the shape to the other bar for rough cutting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.