KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  3-30-2011
Number of Hours:  1.00
Manual Reference:  8
Brief Description:  Assembled material for F-705 bulkhead

Took a while to find all the pieces of raw material as well as the pre-punched pieces. Realized F-706G is needed for tip-up only, after a long search for remnant from which firewall brackets were made, and convincing my self the 2 x 2-1/2 angle really was .187 thick! F-705E doublers were also hiding in a pile of seat-pan pieces.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.