KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  3-6-2011
Number of Hours:  11.30
Manual Reference:  8
Brief Description:  Parts stored; started firewall

Organized the fuselage parts. Big skins against the rear wall of the garage; most of the parts on the wood shelves. Sprayed all of the exposed metal parts of the weldments with Boeshield T9. Sprayed inside the tubes too. Started the firewall. Fabricated the F-601J angles, F-601P spacers, and F-601E stiffener, which went in a little crooked and needs to be re-done. Fabricated the F-601Z fuel pump doubler. Clecoed everything together, drilling the firewall where needed. Still have to drill out most of the holes.
' style=

Parts put away...

Parts put away...

' style=

Cardboard from crate makes a dwg board

Cardboard from crate makes a dwg board

' style=

Firewall components ready to drill

Firewall components ready to drill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.