KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  9-6-2008
Number of Hours:  4.50
Manual Reference:  7
Brief Description:  Flaps--completed match drilling

Finished spar and top skin match drilling on the left flap. Clecoed up the nose skins on the right flap, inserted the AEX wedge with the left flaps AEX as spacer, and drilled the right flap.

Took everything apart for de-burr, dimple, and priming.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.