KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  5-12-2007
Number of Hours:  6.00
Manual Reference:  7
Brief Description:  Right tank to spar; drill rt le and tank

Finished drilling holes in right tank z-brackets. Temp riveted the z-brackets.

Fit the W-919 joint plate to the leading edge. Putting the plate in with the rib in place before drilling anything ensured a tight fit in the nose of the LE this time. I'll try duplicating another plate from this one for the left wing so I don't have to use the two pieces I split it into. (Can't slip one in on the left wing with everything dimpled...we'll see.)

Fit tank to spar and drilled: all LE and tank holes to the ribs, all spar to LE ribs, all spar to z-brackets.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.