KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  8-24-2017
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Initial sweep check

Posting project photos I've neglected. (This entry being written 27-Nov-2017). Number of work hours unknown, but I DO recall:

Adjusting mains and nose wheel pressures to level the canopy deck fore and aft and laterally. Tried gauging the wing sweep by plumb-bobbing a chalk line tool at inboard/outboard locations (2 locations on each wing) just off the floor and marking the location with a sharpie mark on the hangar floor. Rolled out a tape measure tape and set it on the four marks. _Looks_ pretty straight...there sure isn't a lot of play moving the wing tip fore and aft to adjust things if it's not straight.
' style=

Tape on one of the cheesy plumb marks

Tape on one of the cheesy plumb marks

' style=

Straight tape hits four floor marks

Straight tape hits four floor marks

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.