KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  9-26-2011
Number of Hours:  3.00
Manual Reference:  7
Brief Description:  Moving day for the Emp and Wings!

With Karl, took the wings and emp parts out of the cradle, lifted the cradle into the bed of the truck, then put the pieces back in the cradle. Secure the cradle with webbing and double checked that all surfaces that might touch/rub had black foam pipe insulation bumpers. Drove the lot over to the storage unit, unloaded and put 'er away for the nonce.
' style=

The aircraft

The aircraft "carrier"

' style=

Karl with the truck loaded

Karl with the truck loaded

' style=

1200+ hrs of work in the bed of the truck!

1200+ hrs of work in the bed of the truck!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.