Brief Description: Pitot/AOA tubing; finished right wing riveting
Fabricated (1/4 soft Al tubing) lines for pitot and AOA lines and installed in left wing. Dabs of black RTV secured the bushings and the lines against rattling. The wire in the photos is a power line for pitot heat, if and when I ever decide to add a heated pitot.
Karl and I finished riveting the outboard bottom skin on the right wing. No more clecoes on that puppy!