KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  2-4-2006
Number of Hours:  3.50
Manual Reference:  6-2,3
Brief Description:  HS edge prep / Start VS

Used swiveling blade hand-deburr tool on HS spar doublers, spars, and edges of skins. Used fine cloth backed sandpaper to round over spar and doubler edges, and take the last bits of burriness off the edges of the skins.

Csk the spar doublers and rear spar halves per the plans for AN426-4 rivets. I clecoed the parts down to a piece of MDF, match drilling a few holes, then drilling holes in the MDF for the holes to be csk. Best job yet with microstop cage the #30 pilot on the bit was fully supported; ran the bit (lubed with a drop of RapidTap) with cordless drill until I felt the motor unload and no more.

Clecoed the doubler to VS-808PP and attach brackets to resulting assembly. Best to drill out the powder coated brackets holes first or clecoes won't easily fit. For the bottom two brackets, drilled out the full 6-hole pattern only for the top bracket. (Other one will be drilled for bolts in assembly w/fuse later, dwg 27/27A.

Finished drilling bottom attach brackets and every other doubler hole that wasn't clecoed. Ready to drill rest of the holes that are filled with clecoes tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.