Mixed up the Pro-Seal and closed up the right tank rear baffle. Riveted the loooooong rows top and bottom, and put in the AD-41H tank pull rivets. Need 20 new AD-42H pull rivets (on order from Van's) to finish the interior z-brackets (which went on the right way round this time tank yoo verra much...).