Started drilling for nutplates on horiz and vertical stab that attached the emp fairing.
Flared the tank vent tubes that penetrate fuse sides and connect the tank vents to the external vents tubes (after going up to panel level then back down to the floor). Fiddly little things that were just *this* much off for swearwordless installation of the AN fittings.