Riveted the two "outboard" pieces of the subpanel together. Will need to bend the vent lines out of the way to install it, but not too much. Riveted the L & R canopy decks to the fuse. Used #30 csk pull rivets where access for squeezing/bucking was a PITA. Used the rivet shaver to cut them flush.