Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
All
7-9-2012
< Previous Log Entry
Next Log Entry >
Date:
7-9-2012
Number of Hours:
2.30
Manual Reference:
Brief Description:
Fitting main LG weldment--LEFT
The left landing gear weldment fit into place w/o fouling on any rivet heads. Drilled for the 5X AN3 bolts that tie the wledment to the lower longeron, web, etc. Need to disassemble, deburr, before bolting in permanently.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.