KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  7-1-2012
Number of Hours:  6.00
Manual Reference:  8
Brief Description:  Priming, painting, riveting

Primed all of the 6061-T6 parts for the fwd top fuselage, as well as fuel valve cover, canopy decks, and the tunnel coverlet than goes in front of the flap motor channel. Painted the fuel valve cover, and coverlet with lt machine grey (they are removable parts). Painted the canopy decks with dk machine grey (they be riveted, eventually).

After dinner, smoothed the edges of the top fwd fuselage ribs and subpanels, then assembled and riveted the F-7108A center rib F-7108B angle, F-7108C plate, F-7109 doubler, and F-7105A center subpanel.

The primer on the F-7109 doubler and F-7108B angle was still soft, so I'll need to touch up dings and scrapes where they occured.
' style=

Center of the top fwd fuse

Center of the top fwd fuse

' style=

Rolled the assy 90 degrees cw

Rolled the assy 90 degrees cw

' style=

Turned the assy 180 degrees to see the F-7108C angle.

Turned the assy 180 degrees to see the F-7108C angle.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.