KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  5-13-2011
Number of Hours:  2.80
Manual Reference:  8
Brief Description:  Longeron preparation

Finished drilling the aft canopy deck to the right longeron. Drilled a.c.d. to the left longeron. Trimmed the a.c.d.'s for slider canopy per the plans.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.