Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
All
4-4-2011
< Previous Log Entry
Next Log Entry >
Date:
4-4-2011
Number of Hours:
1.50
Manual Reference:
8
Brief Description:
F-712 bulkhead
Pulled the material for F-712, F-711, F-710, F-709 blkhds down from the shelves. Fabricated all but the thru holes on the F-712E tie-down bar. The tap I have only goes a bit less than 1" deep, while the plans call for 1-1/4". Need a bigger tap.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.