Brief Description: Vertical Stabilizer Spar and Ribs
Clecoed the rear vertical spar and vertical spar stiffener together. Clecoed all 3 hinge brackets to the rear spar. Back drilled the 2 final holes on the upper VS410PP
Prepared the 4 ribs. Fluted and deburred all ribs. Attached all ribs to the rear and forward vertical spar.
Final Drilled the rear spar and all rib to spar attachments.