Well back from another busy work tour in Papua New Guinea,tripped around a bit this time,10 days on the Sepik river unloading a barge and flying equipment to a new mine location,to moving components for a drill rig on to a mountain top in the Sth Western province ...Well getting close now all these so called 5 minute jobs....yeh right!! Installed seat belts,made a stainless steel doubler plate to back up the park brake valve,this gos on the fwd side of the firewall and stops the twisting of the valve and firewall when depressing the brakes,without it eventually I think the thin firewall may crack out.Gave both doors 3 coats of Poly Brush,and primed all the metal door trimmings.