KitLog pro

Powered By Kitlog Pro v2.0

Kens Web Site
' style=
Date:  9-30-2009
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Sheetmetal work L/H wing

Set out and installation of leading edge wrap,leading edge wrap stiffener tubes cut to length and positioned and drilled to ribs with gusset plates,all deburred and rivetted into position.Prepare lower fuel tank skin and drill off to wing ,all deburred drain doubler installed,acid wash and paint internal skin,ready for reinstallation with rivets and double sided tape.Scuff leading edge spar tube for bonding.
' style=

L/E stiffener tubes and gussets

L/E stiffener tubes and gussets

' style=

L/E wrap installed,ready for bonding

L/E wrap installed,ready for bonding

' style=

Preparation of lower skin.

Preparation of lower skin.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.