KitLog pro

Powered By Kitlog Pro v2.0

Kens Web Site
' style=
Date:  6-25-2009
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Sub panel,tidy up wiring and power up system

Trim and install sub panel over lay,final fit of all switches and circuit breakers.Tidy up wiring and install rotary dimmer switch for glareshield lights.Manifold pressure line run,clock wiring and light installed.Electric system powered up and minor glitches rectified.Make patterns for further decals ect...
' style=

Fit switch panel engraved over lay

Fit switch panel engraved over lay

' style=

Final wiring tidy up and install manifold pressure sense line

Final wiring tidy up and install manifold pressure sense line

' style=

Engine instruments install

Engine instruments install

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.