KitLog pro

Powered By Kitlog Pro v2.0

Kens Web Site
' style=
Date:  12-20-2008
Number of Hours:  16.00
Manual Reference:  
Brief Description:  Battery box,access panel,controls,

Fit up all components of battery box and access panel,trial fit and trim,drill off all components.remove all parts and debur ,prime with 30-Y-94 primer and install anchor nuts and rivet all assemblies together.Install on A/C.Build up control jackshaft,get assembly running true,minimum friction,install all bushing and assemble into A/C,assembly universal joint and fit 2nd aft control rod,install all control bolts and saftey.Install rudder cable, pulleys and drill and fit fair leads
' style=

Battery box installed,access panel installed

Battery box installed,access panel installed

' style=

control jackshaft to aft control rod junction...ummm and Storm the sleepy dog !!!

control jackshaft to aft control rod junction...ummm and Storm the sleepy dog !!!

' style=

jackshaft with inner control rod fitted rudder cables and fair leads

jackshaft with inner control rod fitted rudder cables and fair leads

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.