Powered By Kitlog Pro v2.0
Kens Web Site
S-7S Courier
All
7-6-2010
< Previous Log Entry
Next Log Entry >
Date:
7-6-2010
Number of Hours:
12.00
Manual Reference:
Brief Description:
Fabric cabin doors
Prepare both cabin doors and install fabric to the two frames,smooth over the entire items and coat both doors with Poly Brush.Edge taping to both doors completed.Burn all bolt holes and openings for drains.
Covering process
Second peice of fabric going on
Fabric complete and Poly Brushed ready for taping
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-7S Courier Home
Category
# Logs
# Hours
All
159
1129
Airframe,Firewall fw
5
24
Auxillary fuel syst.
2
10
Avionics
2
18
Electrical / Instrum
4
38
Empennage
5
69
Engine
9
72
facility
1
50
Fuselage
48
348
Miscellaneous
27
164
None
1
1
Paint
15
74
propeller Inst..
2
13
Test flying
2
4
The End
1
1
Weight and ballance
1
9
Wings
8
48
Wings
26
186
Copyright © 2001-2024 Matronics. All Rights Reserved.