KitLog pro

Powered By Kitlog Pro v2.0

KENNETH'S WEB SITE
' style=
Date:  4-6-2010
Number of Hours:  3.90
Manual Reference:  
Brief Description:  interior side panels

installed both interior side panels with 3/32" blind rivets. Prepped and painted the interior canopy frame and bow with Rustoleum Hammered Spray paint. Filed down the canopy retaining pin to ensure smooth operation of the canopy.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.