Powered By Kitlog Pro v2.0
KENNETH'S WEB SITE
RV8
Fuselage
4-15-2010
< Previous Log Entry
Next Log Entry >
Date:
4-15-2010
Number of Hours:
3.00
Manual Reference:
Brief Description:
landing gear intersection fairings
reinstalled the gear leg and wheel fairings in prep for installing the intersection fairings. First I drilled and installed 1/4 degree shims on both axels due to a slight toe-in on both wheels.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
235
1380
Avionics
8
66
canopy
20
104
Electrical
5
31
Empennage
9
126
Engine
20
148
Fuselage
67
427
Lighting
2
18
Miscellaneous
13
64
Painting
19
137
Prop
1
3
Wings
71
256
Copyright © 2001-2024 Matronics. All Rights Reserved.