Powered By Kitlog Pro v2.0
KDaniels
RV-10
All
12-28-2014
< Previous Log Entry
Next Log Entry >
Date:
12-28-2014
Number of Hours:
2.50
Manual Reference:
8-8
Brief Description:
HS skeleton
Cleaned the workshop and then match drilled the 2 inboard nose ribs and inspar ribs to the forward HS spar.
Clecoed the rest on the nose ribs to the forward HS spar ready for match drilling.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
127
315
Empennage
112
278
Miscellaneous
14
34
Tools
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.