KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-27-2019
Number of Hours:  10.40
Manual Reference:  
Brief Description:  Wiring, elevator

6/25/19
3.7 Hours
Completed plug for root of right wing. Prepared wires at wing tips for connection to strob/nav lights. Connected intercomm to power and ground. Right side audio now works.

6/26/19
2.6 Hours
Had to fish the trim cable that was coied up and taped to the floor in front of the most foreward aft bulkhead. Zip-tied a piece of spirial wrap to cable. Preped cable end and added a six pin plug (only 5 pins used). Will tackle stab/elevator service bulletin next, looks like about 130 rivets have to be removed (@!#*!) for the hinge alone.

6/27/19
4.1 Hours
Tried the new fulel elbows received from ASS. Will have to make some washers for them. Conected the cabin heat push/pull cable to the heat butterfly valve in the firewall. Moved a bunch of stuff off the table. Moved the elevator to table. Drilled the 66 rivets in prep for Service Bulletin October 11, 2018's new 8 ft hinge install,
' style=

Norma testing audio

Norma testing audio

' style=

Trim plug in tail

Trim plug in tail

' style=

Elevator hiinge removed

Elevator hiinge removed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.