1/11/19 Received replacement ADARS cable from Approach Fast Stack and capacitor and bolts from ASS. 2.2 Hours Drilled hole in instrument panel bulkhead for right side backup throttle. Started to install master solienoid but found the bolts too long. Clamped and back drilled holes into mic/phone jack holder and center consol.
1/12/19 2.4 Hours Drilled holes for ADARS cable and pitot and static lines. Temp installed cable to see routing and interferance with other lines and wires.
1/13/19 1.4 Hours Had Norma hold SV-COM-C25 radio in place while I marked and back drilled four mounting holes. Did the same for the transponder mount and the EMS box.