10/23/19 3.1 Hours Pressed in the five other round nuts into engine flange. Assembled the prop extension, propeller hub, spinner flange, squash plate and spinner. Mounted onto engine flange. Put top cowling onto aircraft and sentered. Shortened oil oil door hinge. Trimed piece of metal for oil door.