KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  2-8-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  GPS wiring & electrical

2/5/19
2.5 Hours
Added padded clamps to inside of flaperon channel cover to hole GPS wires. Fed wire through holes below right seat, following flap motor and trim cable wires. Had Paul look over my revised engine sensor wiring re-route. OK. Talked about a bracket or something to stabilize fuel flow and pressure sensor attached to electric pump.

2/6 & 7
No work. Minus 2 degrees with snow on the sixth and minus 22 on the seventh. Burrr!

2/8
2.5 Hours
Zip tied engine oil temp & press, coolant temps wires. Routed GPS wires through center consol. Added terminals to GPS power and ground wires. Added padded clamp to inside of center console for flap, trim and GPS wires. Put labels on oil temp lead. Picked-up a couple of fuel fittings from local stores for fuel flow and fuel pressure sensors.
' style=

How many fittings? (sung to

How many fittings? (sung to "Blowin in the wind")

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.