Brief Description: Fuel lines and pitot/static lines
1/20/19 2.5 Hours Drilled hole in right side fuselage wing area for fuel line and hole for wireing. Cut top of cabin side channel cover as yesterday. Deburred rivet holes and rounded corners. Decided to use grommets instead of press-to-connect fittings because of clearance from top fuselage stringer.
1/21/19 2.1 Hours Drilled holes for pitot, static lines and wiring in left side fuselage wing area. Deburred right cabin side channel cover. Marked left cabin side channnel cover for pitot/static lines
1/22/19 2.3 Hours Mounted three padded clamps inside vertical flaperon channel on left side of cabin for pitot and static lines.