KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  1-4-2019
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Electrical

1/2/19
Received Dynon package and Apprpach Fast Stack cables from Zenith. WOW!
1.1 Hour
Added labels, terminals and heat shrink to ground wires from cigarette lighter and USB power plug.

1/3/19
1.4 Hours
Located a spot for master solenoid on firewall. Drilled holes for bolts. Did some planning to find a spot for the ADAHRS module that was at least 2 feet from steel (controls). Will have to see how long the cables are.

1/4/19
Spent two hours planning locations for electronics. Wanted to mount mic/phone jacks on top of center console behind seats to keep cords out of the way, but pre-made wires from Approach are not long enough. I think moving the jacks forward on top of center console will be OK Had Dynon installation manual (571 pages) printed.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.