12/8/18 3.2 Hours Drilled mounting holes in center console for power outlet. Temp mounted flap motor. Drilled holes in cabin cross members for flap and trim wiring routing. Deburred. Added grommets and ran wire. Tie wraped. Removed left throttle cable and trimmed cable sleeve to give better relief to cable. Added fire sleeve to engine main fuel line.
12/9/18 1.3 Hours Removed right throttle cable and trimmed cable sleeve to give better releif to cable. Enlarged hole in front seat channel cross member. Added grommet. Routed trim/flap wires forward. Wire tied.
121018 Received ground terminal block and shieled 18 AWG from ASS. 2.1 Hours Brake lines attached to master cylinders and calipers. Parking brake to go. Tested electrical fuction of flap motor, full range twice. Assembled ground terminal block. Attached flaperon motor to mixer.