KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-6-2020
Number of Hours:  6.80
Manual Reference:  
Brief Description:  Propeller, oil system, avionics

4/4/20
Registered ELT with NOAA on line.
1.8 Hours
Slowly tighten propeller clamp bolts, checking pitch each revolution. Repair one ground wire under panel that came apart.

4/5/20
3.3 Hours
Torqued the 18 prop bolts in small increments as per WarpDrive instructions. Final torque: 120 in/lbs for clamp bolts and 175 in/lbs for mount bolts. Went to work in the hell hole (HH) to set the artificial horizon on the Dynon. Tightened the set screws and zip tied cable running to the ADAHRS box. Paul stopped by and we talked about the oil pressure problem. Put spark plugs back in and burped the oil system (a Rotax thingy). Removed plugs again and spun engine longer than I had done the other day. The oil pressure came up. Glory be. What a load off my mind.

4/6/20
1.7 Hours
Riveted ADAHRS base into place. Verified flaperon were both in nutral position then tightned jam nuts in the HH on linkage swivels. Tightened throtle linkage. More zip tie of wires.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.