11/3/18 2.8 Hours Engine on and off several times to get the oil line from the banjo fitting in right place. Finally ran it out the back at about a 45 deg angle. Lots of jocking.
11/4/18 3.2 Hours Finished lever arm for cabin heat butterfly valve. Drilled two more holes in flange and up drilled to #30. Made parking brake cable bracket from 1 1/2" L angle.
11/5/18 Winter is here? Put heaters back on timers High temps in 30s this week.. 3.3 Hours Parking brake cable bracket and cabin heat cable bracket tweeks. Sort of marked center console for location of their control knobs.