KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  10-29-2018
Number of Hours:  6.80
Manual Reference:  
Brief Description:  Firewall forward

10/27/18
Received AN6-32 bolts and castle nuts from ASS.
1.5 Hours
Locktite did not set-up overnight on the water pump socket. Added some more. We''ll see tomorrow. Re-installed water pump on rear of engine. Installed the two AN6-32 bolts on engine mount.

10/28/18
Watched HomebuiltHELP "Rotax 912S Zenith CH750 Engine Installation Workshop". Some ideas. My FWF kit has a few different items.
2.1 Hours
Water pump socket was solid. Located and drilled 2" hole in firewall for cabin heat. Have to make an adapter for heat butterfly valve. The arm is at 90 deg to flap. Should be at 45 deg. otherwise there is no way to open valve all the way unless a real long cable bracket is used.

10/29/18
3.2 Hourss
Continued with the adapter for cabin heat.Drilled three pilot holes in flange at 120 deg spaceing. Test fit 90 deg oil line fititings on oil coolter and oil tank. Adjusted banjo oil fitting on bottom of engin to about 90 deg to center line. Did not tighten to make final adjustment easier.
' style=

Cabin heat hole in FW

Cabin heat hole in FW

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.