KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  4-28-2020
Number of Hours:  4.70
Manual Reference:  
Brief Description:  Controls

4/26/20
1.0 Hours
Zip tied wires in right wing root that I had seperated to install shut-off valve. Trying to figure out how to install bungee for elevator control cables in aft fuselage. That is one of those things that should be done when assembling fuselage. Oh, well, next plane. Thinking of installing an access door, seeing as how the bungee will have to be replaced every so often.

4/27/20
1.2 Hours
Reviewed the photo manual and read some of the online fourms for the elevator control cables. Drilled a 3/16" hole in first diagonal L angle aft of bulkhead on right side fo aircraft, Added a commercial bungee from hole, around elevator cable and back. What a difference to the controls. Flaperon centers and feels more balanced. Elevator has less flopping around, I think it will work.

4/28/20
2.5 Hours
Deburred and de-labeled break line retainers. Marked location on landing gear for retainers. Made gust stop for elevator from scrap. Will get a "Remove Before Flight" streamer..
' style=

Elevator cable bungee

Elevator cable bungee

' style=

Gust lock

Gust lock

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.