1/24/20 2.5 Hours Trim and fit, trim and fit. Worked on left plastic wing tip pieces. Chris Mcatee, A&P and EAA Tech Advisorr stopped by to look over things and talk about progress.
1/25/20 1.6 Hours At home, after preping, painted flaperon plastic tips with Krylon Fusion paint for plastic. At hangar, worked on right plastic wing tip pieces.
1/26/20 2.5 Hours Added heat shrink to connectors of ground wires of for both left and right strobe lights. Finished right wing tip. Continued with the left tip.