KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  11-22-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Flaperon work and cowling

11/20/19
2.0 Hours
Up drilled the rest of the flaperon wing arms to 1/4" and the flaperon mounting stubs to 3/16". Installed the pivot bushings in six arms (already in other two).

11/21/19
1.3 Hours
Tried some metal polish to get the mouse urine etch off right inboard flaperon. Did not work. Used sample canloc kit from Dallas to detirmine which camlocs to use on cowl. The samples were not long enough (only went to a #4). Ordered a couple of #5s amd #6s from ASS.

11/22/19
1.7 Hours
Up drilled the pilot holes in upper cowl to 1/4" for camloc studs. Riveted oil door hinge to cowl. Installed oil door Dzus fastener spring with flush A5 rivets.
' style=

Oil door dzus spring

Oil door dzus spring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.