KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  10-23-2019
Number of Hours:  3.10
Manual Reference:  Section 8: Cowl
Brief Description:  Propeller, cowling

10/23/19
3.1 Hours
Pressed in the five other round nuts into engine flange. Assembled the prop extension, propeller hub, spinner flange, squash plate and spinner. Mounted onto engine flange. Put top cowling onto aircraft and sentered. Shortened oil oil door hinge. Trimed piece of metal for oil door.
' style=

Press in round nuts

Press in round nuts

' style=




' style=

Oil door cut to shape

Oil door cut to shape

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.