1/30/19 2.1 Hours Added labels, terminals, heat shrink to AWG 18 wire for: Power panel (pwrpnl) to master solinoid; starter switch to starter solinoid; pwrpnl to starter switch.
1/31/19 Received SV-ADSB-472 and antenna from Dynon. 2.0 Hours Continue labeling, and cutting wires to length in EMS cable.
2/1/19 Received more terminals from SteinAir. 1.7 Hours Norma reached into the access hole on the bottom and held screw while I tightened the nut on the padded pitot/static clamp from the inside. Continue with EMS cable wiring. Looks like I'll need another hole in firewall for more wires. Don't want to make current one any larger.