KitLog pro

Powered By Kitlog Pro v2.0

Jay's Cruzer
' style=
Date:  1-25-2019
Number of Hours:  5.30
Manual Reference:  
Brief Description:  ADAHARS line and wire support

1/23/19
2.2 fHours
Made a bracket from 3 " length of L angle to hold squached DG7 padded clamps for pitot/static lines and another padded clamp for ADAHRS cable. Clecoed into place awaiting some grommets.

1/24/19
1 Hour
Deburred ADAHRS mount. Meassured from where I think ADAHRS will go in tail to yesterdays bracket. Markked pitot/static lines that distance (18"). Re-did two of the padded clamps

1/25/19
Received parts from SteinAir
2.1 Hours
Had Paul over to climb into bottom fuselage hatch to back drill pilot holes for ADAHARS mount (he is smaller than I). Clecoed into place then I up drilled from the bottom to #30. Inserted pitot/static lines and ADAHARS cable into bracked and tightened scews. Drilled holes for grommets into top of flaperon side channel cover. Labeled pitot and static lines at the ADAHARS end. Crimped #10 terminals onto AWG 10 fire for the power panel.
' style=

ADAHRS mount clecoed

ADAHRS mount clecoed

' style=

ADAHRS lines support mount

ADAHRS lines support mount

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.